Production Steps
Fusion between the steel sheet and glass coating is very important Glass-Fused-to-Steel tanks production steps because it directly affects the Glass-Fused-to-Steel tank service life. In order to provide a high-quality product to our clients, Shijiazhuang Zhengzhong Technology Co.,Ltd conduct very strict quality control from raw material to final product. Before mass production, raw material and small sample test need to be done to check the quality of raw material and fusion between coating and steel panel, if qualified then mass production will be carried out. Tanks are produced on the automatic production line, to make sure good and stable quality control. After the production all steel panels need to be tested by 1500V spark holiday test, all steel panels are 0 discontinuity.
CNC Laser Cutting
Inputting the Confirmed drawing into the computer, bolt holes and openings will be cut by CNC laser cutting machine automatically.
Предварительная обработка стали - струйная обработка
Изгиб в виде дуги
Струйная обработка в соответствии со стандартом SSPC SP10, поверхность стали серебристого цвета
После струйной обработки стальной панель должна быть изогнута в виде дуги в соответствии с диаметром резервуара.
Автоматическое нанесение эмали
Автоматическое распыление эмали на обе стороны стальной пластины. Толщина покрытия контролируется в диапазоне от 230 микрометров до 450 микрометров.
Hochofen с высокой температурой
При сжигании стальной пластины при температурах от 820°C до 930°C в печи после эмалирования и сушки, способствуется слияние интерфейсов для соединения двух материалов.
Обзор продукта
Проверка качества должна проводиться после производства. Это включает проверку толщины краски, испытание на герметичность, согласованность цветов и т. д.